Tipper ‎– The Critical Path

Label:
Higher Ground ‎– HIGH9LP, Higher Ground ‎– 4946851000
Format:
2 × Vinyl, LP, Album
Country:
Released:
Genre:
Style:

Tracklist Hide Credits

A1 Twister 6:20
A2 L.E.D Down
Vocals – Sophie Barker
6:15
B1 Seldom Vile 7:15
B2 Supersport 6:10
C1 Sort Code 5:45
C2 Dissolve (In) 5:17
C3 Dissolve (Out)
Vocals – Deborah Anderson
4:09
D1 Night Vision 5:44
D2 Last Informer
Vocals – Sophie Barker
6:47
D3 On Condition (The Condition) 6:53

Companies, etc.

Credits

Notes

Sony Music Entertainment (UK) Ltd decline any responsibility for loss, damage or death as a result of exploiting this Tipper production.

Original sound recording made by Sony Music Entertainment (UK) Ltd. The copyright in the sound recording is owned by Sony Music Entertainment (UK) Ltd. All tracks ℗1999 except track C3, ℗2000 Sony Music Entertainment Ltd. ©2000 Sony Music Entertainment (UK) Ltd. Published by Chrysalis Music Ltd. Distribution Sony Music.

Plain black inner sleeves with catalog number at the bottom.

Barcode and Other Identifiers

  • Barcode: 5 099749 468511
  • Label Code: LC 0162
  • Matrix / Runout (Side A Etched): -PAULS ¦ CUTZ-
  • Matrix / Runout (Side A Stamped): 4946851000 1A1
  • Matrix / Runout (Side B Stamped): 4946851000 2B1
  • Matrix / Runout (Side C Stamped): 4946851000 3C1
  • Matrix / Runout (Side D Stamped): 4946851000 1D1
  • Rights Society: MCPS/BIEM/SDRM
  • Other (Inner Sleeve Catalog Number): 4946851000/BG1
  • Other (Inner Sleeve Catalog Number): 4946851000/BG2

Other Versions (2 of 2) View All

Cat# Artist Title (Format) Label Cat# Country Year
HIGH9CD, 4946852000 Tipper The Critical Path(CD, Album) Higher Ground, Higher Ground HIGH9CD, 4946852000 UK 2000 Sell This Version
HGCD34 Tipper The Critical Path(CD, Album, Promo) Higher Ground HGCD34 UK 2000 Sell This Version

Recommendations

Reviews

Add Review

1984__the--djphunk

1984__the--djphunk

January 9, 2020
Historical releases .............................. after this production Electro turn all in this direction.